Begin typing your search...

Train's Trial Run Successful On Katra-Srinagar Line

Train's Trial Run Successful On Katra-Srinagar Line

Trains Trial Run Successful On Katra-Srinagar Line
X

20 Jan 2025 10:48 AM IST

Jammu: A 22-bogie train chugged between Katra and Srinagar railway stations on Sunday, officials said, marking the first successful trial run on the newly completed line to connect Kashmir with the rest of the country via rail.

The train, comprising 18 AC coaches, two luggage carriers and two engines, left the Katra railway station at around 8 am, successfully reaching its destination within four hours under the watchful eyes of the railway authorities, the officials said.

This was the first trial run between Katra and Srinagar, and came within six days after the Commissioner of Railway Safety (Northern Circle) Dinesh Chand Deshwal authorised the opening of the newly constructed Broad Gauge line.

He had given the authorisation for the start of public carriage of goods and passenger traffic in a seven-page letter to the ministry and railway authorities, based on his detailed inspection of the track on January 7 and 8. The CRS referred to his inspection of the newly constructed BG line between the Katra and Reasi section by a motor trolley and on foot, followed by a speed trial on the entire section from Katra to Banihal.

He had then authorised regular opening of the section for passengers and freight traffic at a maximum permissible speed of 85 Kmph on the main line and 15 kmph on turnout.

Train trial Kashmir Katra-Srinagar railway railway connectivity Broad Gauge line 
Next Story
Share it