Begin typing your search...
‘FGD Hot Gas In’ inaugurated at NTPC Simhadri
NTPC Simhadri’s Unit-four achieved ‘FGD Hot Gas In’ with the assistance of a booster fan, re-circulation pumps, agitators, and auxiliary systems while operating at a unit load of 300 MW on Thursday.
image for illustrative purpose

Visakhapatnam NTPC Simhadri’s Unit-four achieved ‘FGD Hot Gas In’ with the assistance of a booster fan, re-circulation pumps, agitators, and auxiliary systems while operating at a unit load of 300 MW on Thursday.
The event was inaugurated by S K Sinha (Head of Project, Simhadri) along with DP Patra (GM, Operations and Maintenance), Santosh Kumar Jha (GM, Project), Mathew E Kovoor (GM, Maintenance), TR Rajgopalan (GM, Operations), K Jaganmohan Rao (GM) and others.